Home Telecom Medusa Submarine Cable System to Land in Libya by Finish of 2025

Medusa Submarine Cable System to Land in Libya by Finish of 2025

0
Medusa Submarine Cable System to Land in Libya by Finish of 2025

[ad_1]

Medusa Submarine Cable System to Land in Libya
Impartial and impartial Mediterranean submarine infrastructure operator, Medusa Submarine Cable System, and information service supplier in North Africa and Sub-Saharan Africa, Libyan United Worldwide for Telecommunication and Expertise (LUIC), introduced this week that they’ve signed an settlement to increase Medusa to the Libyan coast. The 8,760 km lengthy submarine cable could have two touchdown factors in Libya, connecting the coastal cities of Tripoli and Benghazi, in keeping with the assertion.

Additionally Learn: Orange Tunisia and Medusa to Develop Longest Subsea Cable System within the Mediterranean

Geographic Growth

The Libyan branches of the Medusa cable strengthen the connection between North African nations and, consequently, their reference to Southern Europe. With this new settlement, Medusa will join 11 nations via its touchdown factors in Portugal, Morocco, Spain, France, Algeria, Tunisia, Italy, Greece, Cyprus, Egypt, and now Libya.

Necessary cable within the Mediterranean

“Medusa was born with the purpose of being crucial cable within the Mediterranean, and to realize that, it will need to have a strong construction on each shores,” mentioned the Managing Director at Medusa and AFR-IX telecom.

“That’s the reason it has at all times been important to attach all of the nations of North Africa. We’re satisfied that Medusa will mark a optimistic turning level for Libya’s connectivity, and this can have an effect on the area’s economic system.”

Additionally Learn: ASN, Elettra, and Companions Start Building of 8,700 Km Medusa Submarine Cable System

LUIC’s Imaginative and prescient

Libyan United Worldwide Firm for Telecommunication and Expertise (LUIC) acknowledged, “The corporate is engaged on creating and connecting Libya to the world by enhancing connectivity and attaining geographic range of the worldwide submarine cables infrastructure stage. This is able to be performed by establishing new touchdown stations, new routes for crossing subsea cables, utilizing state-of-the-art know-how and digital innovation to learn the nation’s socio-economic growth.”

Additionally Learn: Telecom Egypt and Medusa Submarine Cable Prolong Community to Pink Sea

The submarine cable system, which has segments housing as much as 24 fibre pairs able to transmitting 20 Tbps per fibre pair, is ready to land in Libya by the tip of 2025.

Libya has 13 cable touchdown stations alongside the nation’s north coast, however solely 4 subsea cables join them. The set up of the Medusa submarine cable system in Libya is anticipated to considerably enhance the nation’s connectivity and communication infrastructure.



[ad_2]

LEAVE A REPLY

Please enter your comment!
Please enter your name here